2004
  • Ibrahim Group acquired Allied Bank Limited, one of the five largest commercial banks in Pakistan under the scheme of re-construction of the Bank’s capital undertaken by The State Bank of Pakistan. Ibrahim Group injected equity of PKR. 14.2 billion into the Bank against 325 million shares of the Bank.
  • Major Modernization & Replacement of the Back process equipment of Textile Plant 1 (Ibrahim Textile Mills Ltd.)
2002
  • The expansion unit of Polyester plant started commercial production thus increasing the PSF production capacity from 70,000 tons per annum to 208,600 tons per annum.
2001
  • Four Group companies, Ibrahim Textile Mills Ltd., A.A Textiles Ltd., Zainab Textile Mills Ld. and Ibrahim Energy Limited were merged into Ibrahim Fibres Limited.
1996
  • Commissioning of the Polyester Staple Fibre plant having an annual production capacity of 70,000 tons per annum.
1994
  • The Group commenced the start-up of Polyester Staple Fibre Manufacturing Plant having a capacity to produce 70,000 tons of PSF per annum.
  • The Group established Ibrahim Energy Limited, a 31.8 MW power generation plant.
1989
  • The Group established the third Textile spinning plant, Zainab Textile Mills Limited, having a capacity of 38,400 spindles.
1984
  • The Group established the second Textile spinning plant, A.A Textiles Limited, presently having a capacity of 40,128 spindles.
1980
  • The Group established Ibrahim Textile Mills Limited, a Textile spinning plant presently having a capacity of 58,080 spindles.